enar

Success Stories

Successful projects are often the inspiration for new green investment opportunities. The examples provided here demonstrate what has already been achieved with GEFF expertise and financial help.

 

Process Machine Replacement

02.11.2017 -

Fresh Electric had an ambitious plan of replacing 13 plastic injection machines, used in the production of home appliances, which is very energy intensive machinery, with new energy-efficient ones. At the initial stage, they purchased a new sheet-cutting line and a new boiler instead. The water vapour released by this boiler is reused to heat

DETAILS

Process Machine Replacement

23.10.2017 -

This group is considered to be one of the largest and most diversified food companies in the Middle East. It manages over 28 food factories recognized for their operational standards for the renowned certifications: ISO2000, ISO9001, ISO14001, HACCP and FDA. Their development strategy included the replacement of four production lines and cold storage unit for

DETAILS

Process Machine Replacement

23.10.2017 -

The Egyptian Company for Glass Manufacturing, El-Gawhara was looking to replace an old oven that consumed a lot of energy with a new one which included an enhanced automatic burning process that increases the production capacity and saves a significant amount of energy. Through the programme, they were able to obtain $1,240,000, which they used

DETAILS

Process Machine Replacement

23.10.2017 -

El-Foam industries is one of the oldest in the field of industrial foam manufacturing in Egypt. The company’s operations started since the 1970s. The main product is industrial sponge and its derivatives. The management had the vision of investing in more efficient equipment that would save 40 % of raw materials’ loss, increase production capacity

DETAILS

Motors & Automation

23.10.2017 -

Established in 2007, our client caters to the requirements of the local Egyptian market. It is a progressively growing business which is currently going through maintenance works of their existing production lines as well as acquiring additional ones. EgyptSEFF funded the replacement of their production line motors with more efficient ones as well as the

DETAILS

Waste Heat to Power Generation

02.03.2017 -

Our client was established in 2006 and specializes in manufacturing fully soluble solid and liquid fertilizing formulas. Managed by a team of visionary leaders, the business plan was designed with competitive business objectives that include increasing the overall production capacity and reducing the dependence on the grid for electrical supply. The production process results in

DETAILS

Process Machine Replacement

02.03.2017 -

This Client is one of the leading Glass manufacturers in Egypt. Their international standards of operation are attested through ISO 14001, OHSAS 18001 and ISO 9001. Their product quality paved their way to penetrate markets in Europe, Africa and Asia. Aspiring to competitively meet their demand, the Client replaced their old furnace with a newer

DETAILS

Process Machine Replacement

23.02.2017 -

This Poultry Farm is an ambitiously growing business that changed ownership in January 2015. The new management rolled out its acquisition and optimization strategy that focused on reducing cost and maximizing revenues. Their change strategy included the replacement of eight old cage system batteries with new, more efficient ones that saved on water and electricity consumption. The new system

DETAILS

Process Machine Replacement

09.01.2017 -

This Client is a leading printing and packaging manufacturer in Egypt. It serves large multinational companies across the Middle East through their range of food and beverage packing products. The company produces paper cups for hot and cold as well as all ice-cream packages in their different shapes and sizes. The Company replaced three old packaging production lines with

DETAILS